US Bridges

Webster RD over I80 Ohio Tpk

Good

Cuyahoga County, Ohio · 1.4MI East of Exit 10 · Structure no. 1829629

Built
1954
71 years old, rebuilt 2020
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
204 ft
2 main spans
Daily traffic
30,000
1990 count
Owner
Toll Authority
State Toll Authority

About this bridge

Webster RD over I80 Ohio Tpk is a steel continuous stringer/multi-beam or girder carrying Webster RD over I80 Ohio Tpk in Cuyahoga County, Ohio. It was built in 1954 and reconstructed in 2020, so it is 71 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30,000 vehicles a day, roughly 20% of them trucks, projected to reach 34,922 by 2010. The structure is 204 ft (62.2 m) long and 34 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesWebster RD
CrossesI80 Ohio Tpk
Location1.4MI East of Exit 10
RouteCity Street 13389
StateOhio
Coordinates41.3284, -81.80096
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating35.7 US tons
Inventory rating21.4 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2 (+2 approach)
Design loadOther
Structure length204 ft (62.2 m)
Longest span69 ft (21 m)
Deck width34 ft (10.5 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deck20 ft (6.1 m)

Traffic and service

Average daily traffic30,000 (1990)
Projected traffic34,922 by 2010
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Webster RD over I80 Ohio Tpk built?

It was built in 1954, making it 71 years old in 2025. It was reconstructed in 2020.

What condition is Webster RD over I80 Ohio Tpk in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Webster RD over I80 Ohio Tpk carry?

About 30,000 vehicles per day (1990 count), of which roughly 20% are trucks.

How long is Webster RD over I80 Ohio Tpk?

The structure is 204 ft (62.2 m) long with a longest span of 69 ft (21 m) and a deck 34 ft wide.

Who owns Webster RD over I80 Ohio Tpk?

It is owned by the State Toll Authority.