US Bridges

Exit Ramp to W.150 over CSX RR

Fair

Cuyahoga County, Ohio · 1.13 Mi. E. of Jct. I-71 · Structure no. 1814281

Built
1980
45 years old
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
260 ft
3 main spans
Daily traffic
7,960
2000 count
Owner
State
State Highway Agency

About this bridge

Exit Ramp to W.150 over CSX RR is a steel continuous stringer/multi-beam or girder carrying Exit Ramp to W.150 over CSX RR in Cuyahoga County, Ohio. It was built in 1980, so it is 45 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,960 vehicles a day, roughly 8% of them trucks, projected to reach 11,048 by 2020. The structure is 260 ft (79.2 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesExit Ramp to W.150
CrossesCSX RR
Location1.13 Mi. E. of Jct. I-71
RouteInterstate 480
StateOhio
Coordinates41.42075, -81.79821
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.9 US tons
Inventory rating44.6 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length260 ft (79.2 m)
Longest span104 ft (31.7 m)
Deck width31 ft (9.5 m)
Roadway width28 ft (8.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,960 (2000)
Projected traffic11,048 by 2020
Trucks8%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Exit Ramp to W.150 over CSX RR built?

It was built in 1980, making it 45 years old in 2025.

What condition is Exit Ramp to W.150 over CSX RR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does Exit Ramp to W.150 over CSX RR carry?

About 7,960 vehicles per day (2000 count), of which roughly 8% are trucks.

How long is Exit Ramp to W.150 over CSX RR?

The structure is 260 ft (79.2 m) long with a longest span of 104 ft (31.7 m) and a deck 31 ft wide.

Who owns Exit Ramp to W.150 over CSX RR?

It is owned by the State Highway Agency.