US Bridges

IR90 over E 152nd over CR-362 (e 152 St)

Good

Cuyahoga County, Ohio · 4.45 MI W of JCT SR175 · Structure no. 1808702

Built
1960
65 years old, rebuilt 2021
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
260 ft
4 main spans
Daily traffic
112,665
2015 count
Owner
State
State Highway Agency

About this bridge

IR90 over E 152nd over CR-362 (e 152 St) is a steel continuous stringer/multi-beam or girder carrying IR90 over E 152nd over CR-362 (e 152 St) in Cuyahoga County, Ohio. It was built in 1960 and reconstructed in 2021, so it is 65 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 112,665 vehicles a day, roughly 4% of them trucks, projected to reach 156,379 by 2038. The structure is 260 ft (79.2 m) long and 142 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIR90 over E 152nd
CrossesCR-362 (e 152 St)
Location4.45 MI W of JCT SR175
RouteInterstate 90
StateOhio
Coordinates41.56773, -81.57545
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length260 ft (79.2 m)
Longest span81 ft (24.7 m)
Deck width142 ft (43.3 m)
Roadway width139 ft (42.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic112,665 (2015)
Projected traffic156,379 by 2038
Trucks4%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IR90 over E 152nd over CR-362 (e 152 St) built?

It was built in 1960, making it 65 years old in 2025. It was reconstructed in 2021.

What condition is IR90 over E 152nd over CR-362 (e 152 St) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does IR90 over E 152nd over CR-362 (e 152 St) carry?

About 112,665 vehicles per day (2015 count), of which roughly 4% are trucks.

How long is IR90 over E 152nd over CR-362 (e 152 St)?

The structure is 260 ft (79.2 m) long with a longest span of 81 ft (24.7 m) and a deck 142 ft wide.

Who owns IR90 over E 152nd over CR-362 (e 152 St)?

It is owned by the State Highway Agency.