US Bridges

Mckinley Avenue over IR-90 (mckinley)

Good

Cuyahoga County, Ohio · .35 MI E of JCT SR237 · Structure no. 1808621

Built
1971
54 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
261 ft
4 main spans
Daily traffic
6,702
2015 count
Owner
State
State Highway Agency

About this bridge

Mckinley Avenue over IR-90 (mckinley) is a steel continuous stringer/multi-beam or girder carrying Mckinley Avenue over IR-90 (mckinley) in Cuyahoga County, Ohio. It was built in 1971, so it is 54 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,702 vehicles a day, roughly 5% of them trucks, projected to reach 9,302 by 2035. The structure is 261 ft (79.6 m) long and 66 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMckinley Avenue
CrossesIR-90 (mckinley)
Location.35 MI E of JCT SR237
RouteCity Street 7730
StateOhio
Coordinates41.47041, -81.81626
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating28.5 US tons
Inventory rating21.4 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadH 20
Structure length261 ft (79.6 m)
Longest span80 ft (24.4 m)
Deck width66 ft (20.1 m)
Roadway width52 ft (15.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,702 (2015)
Projected traffic9,302 by 2035
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Mckinley Avenue over IR-90 (mckinley) built?

It was built in 1971, making it 54 years old in 2025.

What condition is Mckinley Avenue over IR-90 (mckinley) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Mckinley Avenue over IR-90 (mckinley) carry?

About 6,702 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is Mckinley Avenue over IR-90 (mckinley)?

The structure is 261 ft (79.6 m) long with a longest span of 80 ft (24.4 m) and a deck 66 ft wide.

Who owns Mckinley Avenue over IR-90 (mckinley)?

It is owned by the State Highway Agency.