IR90 over E.105th over CR 400 (east 105 St)
FairCuyahoga County, Ohio · 1.31 MI E of SR283DA · Structure no. 1808494
- Built
- 1947
- 78 years old, rebuilt 1961
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 80 ft
- 1 main span
- Daily traffic
- 128,947
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
IR90 over E.105th over CR 400 (east 105 St) is a steel stringer/multi-beam or girder carrying IR90 over E.105th over CR 400 (east 105 St) in Cuyahoga County, Ohio. It was built in 1947 and reconstructed in 1961, so it is 78 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 128,947 vehicles a day, roughly 4% of them trucks, projected to reach 178,978 by 2035. The structure is 80 ft (24.5 m) long and 130 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IR90 over E.105th over CR 400 (east 105 St) built?
It was built in 1947, making it 78 years old in 2025. It was reconstructed in 1961.
What condition is IR90 over E.105th over CR 400 (east 105 St) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does IR90 over E.105th over CR 400 (east 105 St) carry?
About 128,947 vehicles per day (2015 count), of which roughly 4% are trucks.
How long is IR90 over E.105th over CR 400 (east 105 St)?
The structure is 80 ft (24.5 m) long with a longest span of 75 ft (22.9 m) and a deck 130 ft wide.
Who owns IR90 over E.105th over CR 400 (east 105 St)?
It is owned by the State Highway Agency.