US Bridges

Ir 90 EB over CR-58 (dover Center Rd)

Good

Cuyahoga County, Ohio · 2.98 MI E.Basset RD Inter · Structure no. 1808095

Built
1971
54 years old, rebuilt 2002
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
163 ft
3 main spans
Daily traffic
42,874
2015 count
Owner
State
State Highway Agency

About this bridge

Ir 90 EB over CR-58 (dover Center Rd) is a steel continuous stringer/multi-beam or girder carrying Ir 90 EB over CR-58 (dover Center Rd) in Cuyahoga County, Ohio. It was built in 1971 and reconstructed in 2002, so it is 54 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 42,874 vehicles a day, roughly 5% of them trucks, projected to reach 59,509 by 2035. The structure is 163 ft (49.7 m) long and 61 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIr 90 EB
CrossesCR-58 (dover Center Rd)
Location2.98 MI E.Basset RD Inter
RouteInterstate 90
StateOhio
Coordinates41.46855, -81.92144
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.4 US tons
Inventory rating46.4 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length163 ft (49.7 m)
Longest span66 ft (20.1 m)
Deck width61 ft (18.5 m)
Roadway width58 ft (17.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic42,874 (2015)
Projected traffic59,509 by 2035
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ir 90 EB over CR-58 (dover Center Rd) built?

It was built in 1971, making it 54 years old in 2025. It was reconstructed in 2002.

What condition is Ir 90 EB over CR-58 (dover Center Rd) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Ir 90 EB over CR-58 (dover Center Rd) carry?

About 42,874 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is Ir 90 EB over CR-58 (dover Center Rd)?

The structure is 163 ft (49.7 m) long with a longest span of 66 ft (20.1 m) and a deck 61 ft wide.

Who owns Ir 90 EB over CR-58 (dover Center Rd)?

It is owned by the State Highway Agency.