Usr 20 over IR-90 (euclid Ave)
FairCuyahoga County, Ohio · .14 Mi. W. of Jct. US-322 · Structure no. 1807951
- Built
- 1959
- 66 years old, rebuilt 1994
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 156 ft
- 2 main spans
- Daily traffic
- 7,499
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
Usr 20 over IR-90 (euclid Ave) is a steel continuous stringer/multi-beam or girder carrying Usr 20 over IR-90 (euclid Ave) in Cuyahoga County, Ohio. It was built in 1959 and reconstructed in 1994, so it is 66 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,499 vehicles a day, roughly 4% of them trucks, projected to reach 10,409 by 2035. The structure is 156 ft (47.5 m) long and 79 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Usr 20 over IR-90 (euclid Ave) built?
It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1994.
What condition is Usr 20 over IR-90 (euclid Ave) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Usr 20 over IR-90 (euclid Ave) carry?
About 7,499 vehicles per day (2015 count), of which roughly 4% are trucks.
How long is Usr 20 over IR-90 (euclid Ave)?
The structure is 156 ft (47.5 m) long with a longest span of 86 ft (26.2 m) and a deck 79 ft wide.
Who owns Usr 20 over IR-90 (euclid Ave)?
It is owned by the State Highway Agency.