Entrance Ramp over CR 53 (rockside Rd)
GoodCuyahoga County, Ohio · .70 Mi. S. of Jct. I-480 · Structure no. 1806289
- Built
- 1971
- 54 years old, rebuilt 2009
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 176 ft
- 3 main spans
- Daily traffic
- 7,370
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Entrance Ramp over CR 53 (rockside Rd) is a steel continuous stringer/multi-beam or girder carrying Entrance Ramp over CR 53 (rockside Rd) in Cuyahoga County, Ohio. It was built in 1971 and reconstructed in 2009, so it is 54 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,370 vehicles a day, roughly 22% of them trucks, projected to reach 1,023 by 2043. The structure is 176 ft (53.6 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Entrance Ramp over CR 53 (rockside Rd) built?
It was built in 1971, making it 54 years old in 2025. It was reconstructed in 2009.
What condition is Entrance Ramp over CR 53 (rockside Rd) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Entrance Ramp over CR 53 (rockside Rd) carry?
About 7,370 vehicles per day (2023 count), of which roughly 22% are trucks.
How long is Entrance Ramp over CR 53 (rockside Rd)?
The structure is 176 ft (53.6 m) long with a longest span of 96 ft (29.3 m) and a deck 33 ft wide.
Who owns Entrance Ramp over CR 53 (rockside Rd)?
It is owned by the State Highway Agency.