US Bridges

O.C. Blvd (SR-10) over West Wye Tracks Rta RD

Good

Cuyahoga County, Ohio · 800 West of US-422 · Structure no. 1801515

Built
2021
4 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
239 ft
3 main spans
Daily traffic
45,580
2020 count
Owner
State
State Highway Agency

About this bridge

O.C. Blvd (SR-10) over West Wye Tracks Rta RD is a prestressed concrete stringer/multi-beam or girder carrying O.C. Blvd (SR-10) over West Wye Tracks Rta RD in Cuyahoga County, Ohio. It was built in 2021, so it is 4 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 45,580 vehicles a day, roughly 6% of them trucks, projected to reach 52,417 by 2040. The structure is 239 ft (72.9 m) long and 95 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesO.C. Blvd (SR-10)
CrossesWest Wye Tracks Rta RD
Location800 West of US-422
RouteState Highway 10
StateOhio
Coordinates41.48099, -81.6458
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment9: Superior to present desirable criteria
Operating rating68.9 US tons
Inventory rating40.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length239 ft (72.9 m)
Longest span105 ft (31.9 m)
Deck width95 ft (29 m)
Roadway width69 ft (21 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic45,580 (2020)
Projected traffic52,417 by 2040
Trucks6%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was O.C. Blvd (SR-10) over West Wye Tracks Rta RD built?

It was built in 2021, making it 4 years old in 2025.

What condition is O.C. Blvd (SR-10) over West Wye Tracks Rta RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does O.C. Blvd (SR-10) over West Wye Tracks Rta RD carry?

About 45,580 vehicles per day (2020 count), of which roughly 6% are trucks.

How long is O.C. Blvd (SR-10) over West Wye Tracks Rta RD?

The structure is 239 ft (72.9 m) long with a longest span of 105 ft (31.9 m) and a deck 95 ft wide.

Who owns O.C. Blvd (SR-10) over West Wye Tracks Rta RD?

It is owned by the State Highway Agency.