US Bridges

SR 602 over New U.S.30(RELOCATED)

Good

Crawford County, Ohio · 00.75 Miles N.Of S.R.19 · Structure no. 1701738

Built
2003
22 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
242 ft
2 main spans
Daily traffic
1,667
2015 count
Owner
State
State Highway Agency

About this bridge

SR 602 over New U.S.30(RELOCATED) is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 602 over New U.S.30(RELOCATED) in Crawford County, Ohio. It was built in 2003, so it is 22 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,667 vehicles a day, roughly 7% of them trucks, projected to reach 2,314 by 2035. The structure is 242 ft (73.8 m) long and 42 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesSR 602
CrossesNew U.S.30(RELOCATED)
Location00.75 Miles N.Of S.R.19
RouteState Highway 602
StateOhio
Coordinates40.76271, -82.85747
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating69.7 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length242 ft (73.8 m)
Longest span119 ft (36.2 m)
Deck width42 ft (12.9 m)
Roadway width39 ft (12 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,667 (2015)
Projected traffic2,314 by 2035
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 602 over New U.S.30(RELOCATED) built?

It was built in 2003, making it 22 years old in 2025.

What condition is SR 602 over New U.S.30(RELOCATED) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does SR 602 over New U.S.30(RELOCATED) carry?

About 1,667 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is SR 602 over New U.S.30(RELOCATED)?

The structure is 242 ft (73.8 m) long with a longest span of 119 ft (36.2 m) and a deck 42 ft wide.

Who owns SR 602 over New U.S.30(RELOCATED)?

It is owned by the State Highway Agency.