County Road 24 over Bucklew Run
FairCoshocton County, Ohio · 0.10 MI E JCT CR 25 · Structure no. 1635123
- Built
- 2002
- 23 years old
- Condition
- Fair
- inspected March 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 35 ft
- 1 main span
- Daily traffic
- 832
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 24 over Bucklew Run is a prestressed concrete box beam or girders - multiple carrying County Road 24 over Bucklew Run in Coshocton County, Ohio. It was built in 2002, so it is 23 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 832 vehicles a day, roughly 8% of them trucks, projected to reach 1,155 by 2035. The structure is 35 ft (10.7 m) long and 27 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 24 over Bucklew Run built?
It was built in 2002, making it 23 years old in 2025.
What condition is County Road 24 over Bucklew Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does County Road 24 over Bucklew Run carry?
About 832 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is County Road 24 over Bucklew Run?
The structure is 35 ft (10.7 m) long with a longest span of 35 ft (10.7 m) and a deck 27 ft wide.
Who owns County Road 24 over Bucklew Run?
It is owned by the County Highway Agency.