US Bridges

SR 60 over Over Big Run

Good

Coshocton County, Ohio · 1.7 M S of Holmes CO · Structure no. 1601121

Built
1996
29 years old
Condition
Good
inspected January 2025
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
46 ft
1 main span
Daily traffic
457
2015 count
Owner
State
State Highway Agency

About this bridge

SR 60 over Over Big Run is a prestressed concrete box beam or girders - multiple carrying SR 60 over Over Big Run in Coshocton County, Ohio. It was built in 1996, so it is 29 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 457 vehicles a day, roughly 6% of them trucks, projected to reach 634 by 2035. The structure is 46 ft (13.9 m) long and 34 ft wide. If it were closed, the detour would be 16.8 mi (27 km).

CarriesSR 60
CrossesOver Big Run
Location1.7 M S of Holmes CO
RouteState Highway 60
StateOhio
Coordinates40.43206, -81.97068
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length46 ft (13.9 m)
Longest span45 ft (13.6 m)
Deck width34 ft (10.4 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic457 (2015)
Projected traffic634 by 2035
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed16.8 mi (27 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 60 over Over Big Run built?

It was built in 1996, making it 29 years old in 2025.

What condition is SR 60 over Over Big Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does SR 60 over Over Big Run carry?

About 457 vehicles per day (2015 count), of which roughly 6% are trucks.

How long is SR 60 over Over Big Run?

The structure is 46 ft (13.9 m) long with a longest span of 45 ft (13.6 m) and a deck 34 ft wide.

Who owns SR 60 over Over Big Run?

It is owned by the State Highway Agency.