US Bridges

SR 60 over Over Walhonding River

Good

Coshocton County, Ohio · .1 M S of JCT US 36 · Structure no. 1601024

Built
1965
60 years old, rebuilt 2019
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
293 ft
4 main spans
Daily traffic
1,522
2015 count
Owner
State
State Highway Agency

About this bridge

SR 60 over Over Walhonding River is a steel continuous stringer/multi-beam or girder carrying SR 60 over Over Walhonding River in Coshocton County, Ohio. It was built in 1965 and reconstructed in 2019, so it is 60 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,522 vehicles a day, roughly 5% of them trucks, projected to reach 2,113 by 2035. The structure is 293 ft (89.3 m) long and 32 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesSR 60
CrossesOver Walhonding River
Location.1 M S of JCT US 36
RouteState Highway 60
StateOhio
Coordinates40.33348, -82.00812
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating35.7 US tons
Inventory rating28.5 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadH 15
Structure length293 ft (89.3 m)
Longest span80 ft (24.4 m)
Deck width32 ft (9.8 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,522 (2015)
Projected traffic2,113 by 2035
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 60 over Over Walhonding River built?

It was built in 1965, making it 60 years old in 2025. It was reconstructed in 2019.

What condition is SR 60 over Over Walhonding River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does SR 60 over Over Walhonding River carry?

About 1,522 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is SR 60 over Over Walhonding River?

The structure is 293 ft (89.3 m) long with a longest span of 80 ft (24.4 m) and a deck 32 ft wide.

Who owns SR 60 over Over Walhonding River?

It is owned by the State Highway Agency.