US Bridges

Patch Road over Trib E Frk of Todds Fork

Good

Clinton County, Ohio · 0.1 MI N of King RD · Structure no. 1438743

Built
2002
23 years old
Condition
Good
inspected November 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
34 ft
1 main span
Daily traffic
42
2017 count
Owner
County
County Highway Agency

About this bridge

Patch Road over Trib E Frk of Todds Fork is a prestressed concrete box beam or girders - multiple carrying Patch Road over Trib E Frk of Todds Fork in Clinton County, Ohio. It was built in 2002, so it is 23 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 42 vehicles a day, roughly 5% of them trucks, projected to reach 58 by 2037. The structure is 34 ft (10.4 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesPatch Road
CrossesTrib E Frk of Todds Fork
Location0.1 MI N of King RD
RouteCounty Highway T0117
StateOhio
Coordinates39.34172, -83.78191
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating44 US tons
Inventory rating34 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length34 ft (10.4 m)
Longest span33 ft (10.1 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic42 (2017)
Projected traffic58 by 2037
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$42.5 million
NavigationNo navigation control on waterway

Frequently asked questions

When was Patch Road over Trib E Frk of Todds Fork built?

It was built in 2002, making it 23 years old in 2025.

What condition is Patch Road over Trib E Frk of Todds Fork in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Patch Road over Trib E Frk of Todds Fork carry?

About 42 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is Patch Road over Trib E Frk of Todds Fork?

The structure is 34 ft (10.4 m) long with a longest span of 33 ft (10.1 m) and a deck 24 ft wide.

Who owns Patch Road over Trib E Frk of Todds Fork?

It is owned by the County Highway Agency.