Patch Road over Trib E Frk of Todds Fork
GoodClinton County, Ohio · 0.1 MI N of King RD · Structure no. 1438743
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected November 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 34 ft
- 1 main span
- Daily traffic
- 42
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
Patch Road over Trib E Frk of Todds Fork is a prestressed concrete box beam or girders - multiple carrying Patch Road over Trib E Frk of Todds Fork in Clinton County, Ohio. It was built in 2002, so it is 23 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 42 vehicles a day, roughly 5% of them trucks, projected to reach 58 by 2037. The structure is 34 ft (10.4 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Patch Road over Trib E Frk of Todds Fork built?
It was built in 2002, making it 23 years old in 2025.
What condition is Patch Road over Trib E Frk of Todds Fork in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Patch Road over Trib E Frk of Todds Fork carry?
About 42 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Patch Road over Trib E Frk of Todds Fork?
The structure is 34 ft (10.4 m) long with a longest span of 33 ft (10.1 m) and a deck 24 ft wide.
Who owns Patch Road over Trib E Frk of Todds Fork?
It is owned by the County Highway Agency.