US Bridges

Stone Road over Anderson Fork

Good

Clinton County, Ohio · 0.7 MI N of Melvin RD · Structure no. 1432923

Built
1954
71 years old, rebuilt 2002
Condition
Good
inspected October 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
64 ft
1 main span
Daily traffic
891
2016 count
Owner
County
County Highway Agency

About this bridge

Stone Road over Anderson Fork is a prestressed concrete box beam or girders - multiple carrying Stone Road over Anderson Fork in Clinton County, Ohio. It was built in 1954 and reconstructed in 2002, so it is 71 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 891 vehicles a day, roughly 5% of them trucks, projected to reach 1,237 by 2036. The structure is 64 ft (19.5 m) long and 28 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesStone Road
CrossesAnderson Fork
Location0.7 MI N of Melvin RD
RouteCounty Highway C0023
StateOhio
Coordinates39.4894, -83.71504
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.5 US tons
Inventory rating48.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length64 ft (19.5 m)
Longest span62 ft (18.9 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic891 (2016)
Projected traffic1,237 by 2036
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Stone Road over Anderson Fork built?

It was built in 1954, making it 71 years old in 2025. It was reconstructed in 2002.

What condition is Stone Road over Anderson Fork in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Stone Road over Anderson Fork carry?

About 891 vehicles per day (2016 count), of which roughly 5% are trucks.

How long is Stone Road over Anderson Fork?

The structure is 64 ft (19.5 m) long with a longest span of 62 ft (18.9 m) and a deck 28 ft wide.

Who owns Stone Road over Anderson Fork?

It is owned by the County Highway Agency.