Milford Parkway over E Fork Little Miami Riv
GoodClermont County, Ohio · 0.74 MI S of JCT US 50 · Structure no. 1360639
- Built
- 1997
- 28 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 325 ft
- 3 main spans
- Daily traffic
- 22,268
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Milford Parkway over E Fork Little Miami Riv is a prestressed concrete continuous stringer/multi-beam or girder carrying Milford Parkway over E Fork Little Miami Riv in Clermont County, Ohio. It was built in 1997, so it is 28 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 22,268 vehicles a day, roughly 7% of them trucks, projected to reach 30,908 by 2038. The structure is 325 ft (99.2 m) long and 35 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Milford Parkway over E Fork Little Miami Riv built?
It was built in 1997, making it 28 years old in 2025.
What condition is Milford Parkway over E Fork Little Miami Riv in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does Milford Parkway over E Fork Little Miami Riv carry?
About 22,268 vehicles per day (2018 count), of which roughly 7% are trucks.
How long is Milford Parkway over E Fork Little Miami Riv?
The structure is 325 ft (99.2 m) long with a longest span of 160 ft (48.8 m) and a deck 35 ft wide.
Who owns Milford Parkway over E Fork Little Miami Riv?
It is owned by the City or Municipal Highway Agency.