US Bridges

Ninemile Tobasco over Nine Mile Tobasco

Good

Clermont County, Ohio · 80 W of Int.Woodland Tr. · Structure no. 1357795

Built
2019
6 years old
Condition
Good
inspected January 2025
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
90 ft
1 main span
Daily traffic
3,900
2018 count
Owner
County
County Highway Agency

About this bridge

Ninemile Tobasco over Nine Mile Tobasco is a prestressed concrete box beam or girders - multiple carrying Ninemile Tobasco over Nine Mile Tobasco in Clermont County, Ohio. It was built in 2019, so it is 6 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,900 vehicles a day, roughly 5% of them trucks, projected to reach 5,413 by 2038. The structure is 90 ft (27.4 m) long and 28 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesNinemile Tobasco
CrossesNine Mile Tobasco
Location80 W of Int.Woodland Tr.
RouteCounty Highway C0095
StateOhio
Coordinates39.03662, -84.30609
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations on dry land well above flood water elevations
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66 US tons
Inventory rating51 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length90 ft (27.4 m)
Longest span90 ft (27.4 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,900 (2018)
Projected traffic5,413 by 2038
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ninemile Tobasco over Nine Mile Tobasco built?

It was built in 2019, making it 6 years old in 2025.

What condition is Ninemile Tobasco over Nine Mile Tobasco in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Ninemile Tobasco over Nine Mile Tobasco carry?

About 3,900 vehicles per day (2018 count), of which roughly 5% are trucks.

How long is Ninemile Tobasco over Nine Mile Tobasco?

The structure is 90 ft (27.4 m) long with a longest span of 90 ft (27.4 m) and a deck 28 ft wide.

Who owns Ninemile Tobasco over Nine Mile Tobasco?

It is owned by the County Highway Agency.