US Bridges

TR 211 Bargs-Slt R over Ir 275

Good

Clermont County, Ohio · 1.4 MI N of SR32 · Structure no. 1305697

Built
1970
55 years old, rebuilt 2003
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
326 ft
4 main spans
Daily traffic
2,227
2015 count
Owner
State
State Highway Agency

About this bridge

TR 211 Bargs-Slt R over Ir 275 is a steel continuous stringer/multi-beam or girder carrying TR 211 Bargs-Slt R over Ir 275 in Clermont County, Ohio. It was built in 1970 and reconstructed in 2003, so it is 55 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,227 vehicles a day, roughly 5% of them trucks, projected to reach 3,091 by 2035. The structure is 326 ft (99.4 m) long and 34 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTR 211 Bargs-Slt R
CrossesIr 275
Location1.4 MI N of SR32
RouteCounty Highway 211
StateOhio
Coordinates39.1215, -84.27601
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length326 ft (99.4 m)
Longest span99 ft (30.1 m)
Deck width34 ft (10.4 m)
Roadway width31 ft (9.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,227 (2015)
Projected traffic3,091 by 2035
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was TR 211 Bargs-Slt R over Ir 275 built?

It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2003.

What condition is TR 211 Bargs-Slt R over Ir 275 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does TR 211 Bargs-Slt R over Ir 275 carry?

About 2,227 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is TR 211 Bargs-Slt R over Ir 275?

The structure is 326 ft (99.4 m) long with a longest span of 99 ft (30.1 m) and a deck 34 ft wide.

Who owns TR 211 Bargs-Slt R over Ir 275?

It is owned by the State Highway Agency.