US Bridges

I275 NB over NSRR;C106(ROUN Bt Rd);dr

Good

Clermont County, Ohio · .4 MI S of US50F · Structure no. 1305654

Built
1972
53 years old, rebuilt 2003
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
243 ft
4 main spans
Daily traffic
1,149
2015 count
Owner
State
State Highway Agency

About this bridge

I275 NB over NSRR;C106(ROUN Bt Rd);dr is a steel continuous stringer/multi-beam or girder carrying I275 NB over NSRR;C106(ROUN Bt Rd);dr in Clermont County, Ohio. It was built in 1972 and reconstructed in 2003, so it is 53 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,149 vehicles a day, roughly 5% of them trucks, projected to reach 1,595 by 2035. The structure is 243 ft (74 m) long and 74 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI275 NB
CrossesNSRR;C106(ROUN Bt Rd);dr
Location.4 MI S of US50F
RouteInterstate 275
StateOhio
Coordinates39.1544, -84.26664
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating44 US tons
Inventory rating34 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length243 ft (74 m)
Longest span76 ft (23.2 m)
Deck width74 ft (22.5 m)
Roadway width71 ft (21.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,149 (2015)
Projected traffic1,595 by 2035
Trucks5%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I275 NB over NSRR;C106(ROUN Bt Rd);dr built?

It was built in 1972, making it 53 years old in 2025. It was reconstructed in 2003.

What condition is I275 NB over NSRR;C106(ROUN Bt Rd);dr in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does I275 NB over NSRR;C106(ROUN Bt Rd);dr carry?

About 1,149 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is I275 NB over NSRR;C106(ROUN Bt Rd);dr?

The structure is 243 ft (74 m) long with a longest span of 76 ft (23.2 m) and a deck 74 ft wide.

Who owns I275 NB over NSRR;C106(ROUN Bt Rd);dr?

It is owned by the State Highway Agency.