US Bridges

Home RD over Bikeway

Fair

Clark County, Ohio · 0.13 MI E of SR 72 · Structure no. 1260057

Built
1965
60 years old, rebuilt 2013
Condition
Fair
inspected December 2024
Type
Slab
Concrete Continuous
Length
89 ft
3 main spans
Daily traffic
13,289
2015 count
Owner
City
City or Municipal Highway Agency

About this bridge

Home RD over Bikeway is a concrete continuous slab carrying Home RD over Bikeway in Clark County, Ohio. It was built in 1965 and reconstructed in 2013, so it is 60 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 13,289 vehicles a day, roughly 2% of them trucks, projected to reach 18,445 by 2035. The structure is 89 ft (27.1 m) long and 66 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesHome RD
CrossesBikeway
Location0.13 MI E of SR 72
RouteCity Street HOMER
StateOhio
Coordinates39.95305, -83.80145
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length89 ft (27.1 m)
Longest span34 ft (10.4 m)
Deck width66 ft (20.2 m)
Roadway width52 ft (15.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,289 (2015)
Projected traffic18,445 by 2035
Trucks2%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesPedestrian / bicycle
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Home RD over Bikeway built?

It was built in 1965, making it 60 years old in 2025. It was reconstructed in 2013.

What condition is Home RD over Bikeway in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does Home RD over Bikeway carry?

About 13,289 vehicles per day (2015 count), of which roughly 2% are trucks.

How long is Home RD over Bikeway?

The structure is 89 ft (27.1 m) long with a longest span of 34 ft (10.4 m) and a deck 66 ft wide.

Who owns Home RD over Bikeway?

It is owned by the City or Municipal Highway Agency.