C-313 over S Hampton Rd&donnels CR
FairClark County, Ohio · 1/2 Mi. N Lower Valley Pk · Structure no. 1249371
- Built
- 1973
- 52 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 91 ft
- 3 main spans
- Daily traffic
- 875
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
C-313 over S Hampton Rd&donnels CR is a steel continuous stringer/multi-beam or girder carrying C-313 over S Hampton Rd&donnels CR in Clark County, Ohio. It was built in 1973, so it is 52 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 875 vehicles a day, roughly 8% of them trucks, projected to reach 1,215 by 2035. The structure is 91 ft (27.7 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was C-313 over S Hampton Rd&donnels CR built?
It was built in 1973, making it 52 years old in 2025.
What condition is C-313 over S Hampton Rd&donnels CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does C-313 over S Hampton Rd&donnels CR carry?
About 875 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is C-313 over S Hampton Rd&donnels CR?
The structure is 91 ft (27.7 m) long with a longest span of 34 ft (10.4 m) and a deck 30 ft wide.
Who owns C-313 over S Hampton Rd&donnels CR?
It is owned by the County Highway Agency.