US Bridges

T0034 over Crescent Hill & Panther

Good

Clark County, Ohio · 50FT W Willowdale RD · Structure no. 1236230

Built
2024
1 years old
Condition
Good
inspected September 2024
Type
Box Beam or Girders - Multiple
Concrete
Length
34 ft
1 main span
Daily traffic
90
2014 count
Owner
County
County Highway Agency

About this bridge

T0034 over Crescent Hill & Panther is a concrete box beam or girders - multiple carrying T0034 over Crescent Hill & Panther in Clark County, Ohio. It was built in 2024, so it is 1 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 90 vehicles a day, roughly 2% of them trucks, projected to reach 4 by 2035. The structure is 34 ft (10.4 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesT0034
CrossesCrescent Hill & Panther
Location50FT W Willowdale RD
RouteCounty Highway 34
StateOhio
Coordinates40.00812, -83.86702
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating92.5 US tons
Inventory rating55.3 US tons

Structure

MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20 + Mod
Structure length34 ft (10.4 m)
Longest span32 ft (9.8 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic90 (2014)
Projected traffic4 by 2035
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T0034 over Crescent Hill & Panther built?

It was built in 2024, making it 1 years old in 2025.

What condition is T0034 over Crescent Hill & Panther in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does T0034 over Crescent Hill & Panther carry?

About 90 vehicles per day (2014 count), of which roughly 2% are trucks.

How long is T0034 over Crescent Hill & Panther?

The structure is 34 ft (10.4 m) long with a longest span of 32 ft (9.8 m) and a deck 24 ft wide.

Who owns T0034 over Crescent Hill & Panther?

It is owned by the County Highway Agency.