C-308 over ST Paris Pk @ Dry Run
FairClark County, Ohio · So @ Homony Ridge · Structure no. 1235443
- Built
- 1956
- 69 years old, rebuilt 1985
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 43 ft
- 1 main span
- Daily traffic
- 1,926
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
C-308 over ST Paris Pk @ Dry Run is a steel stringer/multi-beam or girder carrying C-308 over ST Paris Pk @ Dry Run in Clark County, Ohio. It was built in 1956 and reconstructed in 1985, so it is 69 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,926 vehicles a day, roughly 1% of them trucks, projected to reach 2,673 by 2035. The structure is 43 ft (13.1 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was C-308 over ST Paris Pk @ Dry Run built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1985.
What condition is C-308 over ST Paris Pk @ Dry Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does C-308 over ST Paris Pk @ Dry Run carry?
About 1,926 vehicles per day (2015 count), of which roughly 1% are trucks.
How long is C-308 over ST Paris Pk @ Dry Run?
The structure is 43 ft (13.1 m) long with a longest span of 39 ft (11.9 m) and a deck 28 ft wide.
Who owns C-308 over ST Paris Pk @ Dry Run?
It is owned by the County Highway Agency.