US Bridges

C-308 over ST Paris Pk @ Dry Run

Fair

Clark County, Ohio · So @ Homony Ridge · Structure no. 1235443

Built
1956
69 years old, rebuilt 1985
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
43 ft
1 main span
Daily traffic
1,926
2015 count
Owner
County
County Highway Agency

About this bridge

C-308 over ST Paris Pk @ Dry Run is a steel stringer/multi-beam or girder carrying C-308 over ST Paris Pk @ Dry Run in Clark County, Ohio. It was built in 1956 and reconstructed in 1985, so it is 69 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,926 vehicles a day, roughly 1% of them trucks, projected to reach 2,673 by 2035. The structure is 43 ft (13.1 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesC-308
CrossesST Paris Pk @ Dry Run
LocationSo @ Homony Ridge
RouteCounty Highway C0308
StateOhio
Coordinates39.98084, -83.85368
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating67.9 US tons
Inventory rating42.9 US tons

Structure

MaterialSteel
DeckWood or timber
Main spans1
Design loadH 20
Structure length43 ft (13.1 m)
Longest span39 ft (11.9 m)
Deck width28 ft (8.6 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,926 (2015)
Projected traffic2,673 by 2035
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was C-308 over ST Paris Pk @ Dry Run built?

It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1985.

What condition is C-308 over ST Paris Pk @ Dry Run in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does C-308 over ST Paris Pk @ Dry Run carry?

About 1,926 vehicles per day (2015 count), of which roughly 1% are trucks.

How long is C-308 over ST Paris Pk @ Dry Run?

The structure is 43 ft (13.1 m) long with a longest span of 39 ft (11.9 m) and a deck 28 ft wide.

Who owns C-308 over ST Paris Pk @ Dry Run?

It is owned by the County Highway Agency.