Mon Twp RD 158 over Indian Fork Easterdoy 30
PoorCarroll County, Ohio · 500 Ft North of ST Rt 39 · Structure no. 1032267
- Built
- 1975
- 50 years old, rebuilt 2010
- Condition
- Poor
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 50 ft
- 1 main span
- Daily traffic
- 209
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Mon Twp RD 158 over Indian Fork Easterdoy 30 is a steel stringer/multi-beam or girder carrying Mon Twp RD 158 over Indian Fork Easterdoy 30 in Carroll County, Ohio. It was built in 1975 and reconstructed in 2010, so it is 50 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 209 vehicles a day, roughly 7% of them trucks, projected to reach 290 by 2035. The structure is 50 ft (15.2 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mon Twp RD 158 over Indian Fork Easterdoy 30 built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2010.
What condition is Mon Twp RD 158 over Indian Fork Easterdoy 30 in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in April 2024.
How much traffic does Mon Twp RD 158 over Indian Fork Easterdoy 30 carry?
About 209 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is Mon Twp RD 158 over Indian Fork Easterdoy 30?
The structure is 50 ft (15.2 m) long with a longest span of 48 ft (14.6 m) and a deck 24 ft wide.
Who owns Mon Twp RD 158 over Indian Fork Easterdoy 30?
It is owned by the County Highway Agency.