Ham New London RD over Trib. to Paddys Run
FairButler County, Ohio · .1 MI N of SR 126 · Structure no. 0931470
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected November 2024
- Type
- Box Beam or Girders - Multiple
- Concrete
- Length
- 25 ft
- 1 main span
- Daily traffic
- 351
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
Ham New London RD over Trib. to Paddys Run is a concrete box beam or girders - multiple carrying Ham New London RD over Trib. to Paddys Run in Butler County, Ohio. It was built in 1986, so it is 39 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 351 vehicles a day, roughly 7% of them trucks, projected to reach 487 by 2037. The structure is 25 ft (7.7 m) long and 25 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ham New London RD over Trib. to Paddys Run built?
It was built in 1986, making it 39 years old in 2025.
What condition is Ham New London RD over Trib. to Paddys Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Ham New London RD over Trib. to Paddys Run carry?
About 351 vehicles per day (2017 count), of which roughly 7% are trucks.
How long is Ham New London RD over Trib. to Paddys Run?
The structure is 25 ft (7.7 m) long with a longest span of 24 ft (7.3 m) and a deck 25 ft wide.
Who owns Ham New London RD over Trib. to Paddys Run?
It is owned by the County Highway Agency.