US Bridges

SR 129 over Lesourds-Westchester RD

Good

Butler County, Ohio · 3.4 MI West of I-75 · Structure no. 0903590

Built
1999
26 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
196 ft
3 main spans
Daily traffic
22,708
2015 count
Owner
State
State Highway Agency

About this bridge

SR 129 over Lesourds-Westchester RD is a steel continuous stringer/multi-beam or girder carrying SR 129 over Lesourds-Westchester RD in Butler County, Ohio. It was built in 1999, so it is 26 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22,708 vehicles a day, roughly 5% of them trucks, projected to reach 31,519 by 2035. The structure is 196 ft (59.6 m) long and 58 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 129
CrossesLesourds-Westchester RD
Location3.4 MI West of I-75
RouteState Highway 129
StateOhio
Coordinates39.3801, -84.42791
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating46.1 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length196 ft (59.6 m)
Longest span82 ft (25 m)
Deck width58 ft (17.8 m)
Roadway width55 ft (16.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,708 (2015)
Projected traffic31,519 by 2035
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 129 over Lesourds-Westchester RD built?

It was built in 1999, making it 26 years old in 2025.

What condition is SR 129 over Lesourds-Westchester RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does SR 129 over Lesourds-Westchester RD carry?

About 22,708 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is SR 129 over Lesourds-Westchester RD?

The structure is 196 ft (59.6 m) long with a longest span of 82 ft (25 m) and a deck 58 ft wide.

Who owns SR 129 over Lesourds-Westchester RD?

It is owned by the State Highway Agency.