US Bridges

SR 129 over Morris Rd.

Good

Butler County, Ohio · 3.03 Mi. East of SR 4 · Structure no. 0903485

Built
1999
26 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
163 ft
3 main spans
Daily traffic
18,239
2015 count
Owner
State
State Highway Agency

About this bridge

SR 129 over Morris Rd. is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 129 over Morris Rd. in Butler County, Ohio. It was built in 1999, so it is 26 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,239 vehicles a day, roughly 11% of them trucks, projected to reach 25,316 by 2035. The structure is 163 ft (49.6 m) long and 58 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesSR 129
CrossesMorris Rd.
Location3.03 Mi. East of SR 4
RouteState Highway 129
StateOhio
Coordinates39.38513, -84.49679
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating29.7 US tons
Inventory rating9.3 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length163 ft (49.6 m)
Longest span70 ft (21.4 m)
Deck width58 ft (17.8 m)
Roadway width55 ft (16.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,239 (2015)
Projected traffic25,316 by 2035
Trucks11%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 129 over Morris Rd. built?

It was built in 1999, making it 26 years old in 2025.

What condition is SR 129 over Morris Rd. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does SR 129 over Morris Rd. carry?

About 18,239 vehicles per day (2015 count), of which roughly 11% are trucks.

How long is SR 129 over Morris Rd.?

The structure is 163 ft (49.6 m) long with a longest span of 70 ft (21.4 m) and a deck 58 ft wide.

Who owns SR 129 over Morris Rd.?

It is owned by the State Highway Agency.