Sardinia Mowrys over East Fork White Oak Cree
GoodBrown County, Ohio · .5 MI N of SR32 · Structure no. 0834750
- Built
- 1991
- 34 years old
- Condition
- Good
- inspected August 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 103 ft
- 1 main span
- Daily traffic
- 1,403
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Sardinia Mowrys over East Fork White Oak Cree is a prestressed concrete box beam or girders - multiple carrying Sardinia Mowrys over East Fork White Oak Cree in Brown County, Ohio. It was built in 1991, so it is 34 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,403 vehicles a day, roughly 7% of them trucks, projected to reach 1,947 by 2035. The structure is 103 ft (31.4 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sardinia Mowrys over East Fork White Oak Cree built?
It was built in 1991, making it 34 years old in 2025.
What condition is Sardinia Mowrys over East Fork White Oak Cree in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does Sardinia Mowrys over East Fork White Oak Cree carry?
About 1,403 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is Sardinia Mowrys over East Fork White Oak Cree?
The structure is 103 ft (31.4 m) long with a longest span of 101 ft (30.8 m) and a deck 24 ft wide.
Who owns Sardinia Mowrys over East Fork White Oak Cree?
It is owned by the County Highway Agency.