US Bridges

CR 4 over Glenns Run

Good

Belmont County, Ohio · 0.61 MI NE of JCT SR 647 · Structure no. 0734330

Built
1995
30 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
100 ft
2 main spans
Daily traffic
1,054
2015 count
Owner
County
County Highway Agency

About this bridge

CR 4 over Glenns Run is a steel continuous stringer/multi-beam or girder carrying CR 4 over Glenns Run in Belmont County, Ohio. It was built in 1995, so it is 30 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,054 vehicles a day, roughly 3% of them trucks, projected to reach 1,463 by 2035. The structure is 100 ft (30.5 m) long and 24 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesCR 4
CrossesGlenns Run
Location0.61 MI NE of JCT SR 647
RouteCounty Highway C0004
StateOhio
Coordinates40.10858, -80.74562
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating64.3 US tons
Inventory rating50 US tons

Structure

MaterialSteel Continuous
DeckCorrugated steel
Main spans2
Design loadHS 20 + Mod
Structure length100 ft (30.5 m)
Longest span47 ft (14.3 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,054 (2015)
Projected traffic1,463 by 2035
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 4 over Glenns Run built?

It was built in 1995, making it 30 years old in 2025.

What condition is CR 4 over Glenns Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does CR 4 over Glenns Run carry?

About 1,054 vehicles per day (2015 count), of which roughly 3% are trucks.

How long is CR 4 over Glenns Run?

The structure is 100 ft (30.5 m) long with a longest span of 47 ft (14.3 m) and a deck 24 ft wide.

Who owns CR 4 over Glenns Run?

It is owned by the County Highway Agency.