SR 149 over Williams Creek
FairBelmont County, Ohio · 3.78 M S of SR 9 · Structure no. 0704938
- Built
- 1939
- 86 years old, rebuilt 1985
- Condition
- Fair
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 62 ft
- 1 main span
- Daily traffic
- 573
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR 149 over Williams Creek is a prestressed concrete box beam or girders - multiple carrying SR 149 over Williams Creek in Belmont County, Ohio. It was built in 1939 and reconstructed in 1985, so it is 86 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 573 vehicles a day, roughly 7% of them trucks, projected to reach 795 by 2035. The structure is 62 ft (18.9 m) long and 31 ft wide. If it were closed, the detour would be 16.8 mi (27 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 149 over Williams Creek built?
It was built in 1939, making it 86 years old in 2025. It was reconstructed in 1985.
What condition is SR 149 over Williams Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does SR 149 over Williams Creek carry?
About 573 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is SR 149 over Williams Creek?
The structure is 62 ft (18.9 m) long with a longest span of 61 ft (18.6 m) and a deck 31 ft wide.
Who owns SR 149 over Williams Creek?
It is owned by the State Highway Agency.