SR 148 over Captina CR
FairBelmont County, Ohio · 0.96 MI W of JCT SR 7 · Structure no. 0704628
- Built
- 1959
- 66 years old, rebuilt 2010
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 372 ft
- 5 main spans
- Daily traffic
- 1,818
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR 148 over Captina CR is a steel continuous stringer/multi-beam or girder carrying SR 148 over Captina CR in Belmont County, Ohio. It was built in 1959 and reconstructed in 2010, so it is 66 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,818 vehicles a day, roughly 9% of them trucks, projected to reach 2,523 by 2035. The structure is 372 ft (113.4 m) long and 37 ft wide. If it were closed, the detour would be 39.8 mi (64 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 148 over Captina CR built?
It was built in 1959, making it 66 years old in 2025. It was reconstructed in 2010.
What condition is SR 148 over Captina CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does SR 148 over Captina CR carry?
About 1,818 vehicles per day (2015 count), of which roughly 9% are trucks.
How long is SR 148 over Captina CR?
The structure is 372 ft (113.4 m) long with a longest span of 75 ft (22.9 m) and a deck 37 ft wide.
Who owns SR 148 over Captina CR?
It is owned by the State Highway Agency.