C505 N Guernsey ST over 48th ST CR-505 Cnt O/ RR
GoodBelmont County, Ohio · 0.04 MI.E.JCT.SR7 & 48th · Structure no. 0700525
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 740 ft
- 7 main spans
- Daily traffic
- 3,167
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
C505 N Guernsey ST over 48th ST CR-505 Cnt O/ RR is a steel continuous stringer/multi-beam or girder carrying C505 N Guernsey ST over 48th ST CR-505 Cnt O/ RR in Belmont County, Ohio. It was built in 1998, so it is 27 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,167 vehicles a day, roughly 4% of them trucks, projected to reach 4,396 by 2038. The structure is 740 ft (225.5 m) long and 40 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was C505 N Guernsey ST over 48th ST CR-505 Cnt O/ RR built?
It was built in 1998, making it 27 years old in 2025.
What condition is C505 N Guernsey ST over 48th ST CR-505 Cnt O/ RR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does C505 N Guernsey ST over 48th ST CR-505 Cnt O/ RR carry?
About 3,167 vehicles per day (2018 count), of which roughly 4% are trucks.
How long is C505 N Guernsey ST over 48th ST CR-505 Cnt O/ RR?
The structure is 740 ft (225.5 m) long with a longest span of 120 ft (36.6 m) and a deck 40 ft wide.
Who owns C505 N Guernsey ST over 48th ST CR-505 Cnt O/ RR?
It is owned by the State Highway Agency.