Steinecker Street over Miami-Erie Canal Feeder
GoodAuglaize County, Ohio · South Side Goodyear Plant · Structure no. 0660124
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 76 ft
- 1 main span
- Daily traffic
- 700
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Steinecker Street over Miami-Erie Canal Feeder is a prestressed concrete box beam or girders - multiple carrying Steinecker Street over Miami-Erie Canal Feeder in Auglaize County, Ohio. It was built in 2006, so it is 19 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 700 vehicles a day, roughly 3% of them trucks, projected to reach 700 by 2045. The structure is 76 ft (23.3 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Steinecker Street over Miami-Erie Canal Feeder built?
It was built in 2006, making it 19 years old in 2025.
What condition is Steinecker Street over Miami-Erie Canal Feeder in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does Steinecker Street over Miami-Erie Canal Feeder carry?
About 700 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is Steinecker Street over Miami-Erie Canal Feeder?
The structure is 76 ft (23.3 m) long with a longest span of 74 ft (22.5 m) and a deck 30 ft wide.
Who owns Steinecker Street over Miami-Erie Canal Feeder?
It is owned by the City or Municipal Highway Agency.