Townline-Lima Road over Auglaize River
FairAuglaize County, Ohio · 4.6 MI N of SR 33 · Structure no. 0631353
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected July 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 140 ft
- 2 main spans
- Daily traffic
- 386
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Townline-Lima Road over Auglaize River is a prestressed concrete box beam or girders - multiple carrying Townline-Lima Road over Auglaize River in Auglaize County, Ohio. It was built in 1984, so it is 41 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 386 vehicles a day, roughly 7% of them trucks, projected to reach 421 by 2045. The structure is 140 ft (42.7 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Townline-Lima Road over Auglaize River built?
It was built in 1984, making it 41 years old in 2025.
What condition is Townline-Lima Road over Auglaize River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Townline-Lima Road over Auglaize River carry?
About 386 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is Townline-Lima Road over Auglaize River?
The structure is 140 ft (42.7 m) long with a longest span of 68 ft (20.7 m) and a deck 26 ft wide.
Who owns Townline-Lima Road over Auglaize River?
It is owned by the County Highway Agency.