US Bridges

TR-120 Pusheta RD over Ir 75

GoodPosted for load

Auglaize County, Ohio · 1.97 Mi. S. of USR-33 · Structure no. 0601950

Built
1962
63 years old, rebuilt 1998
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
230 ft
4 main spans
Daily traffic
344
2016 count
Owner
State
State Highway Agency

About this bridge

TR-120 Pusheta RD over Ir 75 is a steel continuous stringer/multi-beam or girder carrying TR-120 Pusheta RD over Ir 75 in Auglaize County, Ohio. It was built in 1962 and reconstructed in 1998, so it is 63 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 344 vehicles a day, roughly 6% of them trucks, projected to reach 477 by 2036. The structure is 230 ft (70.1 m) long and 30 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTR-120 Pusheta RD
CrossesIr 75
Location1.97 Mi. S. of USR-33
RouteCounty Highway 120
StateOhio
Coordinates40.52612, -84.1699
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 12 months
Operating statusPosted for load restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating37.8 US tons
Inventory rating22.5 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadH 15
Structure length230 ft (70.1 m)
Longest span70 ft (21.3 m)
Deck width30 ft (9.2 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic344 (2016)
Projected traffic477 by 2036
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was TR-120 Pusheta RD over Ir 75 built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 1998.

What condition is TR-120 Pusheta RD over Ir 75 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does TR-120 Pusheta RD over Ir 75 carry?

About 344 vehicles per day (2016 count), of which roughly 6% are trucks.

How long is TR-120 Pusheta RD over Ir 75?

The structure is 230 ft (70.1 m) long with a longest span of 70 ft (21.3 m) and a deck 30 ft wide.

Who owns TR-120 Pusheta RD over Ir 75?

It is owned by the State Highway Agency.