Southland RD TR-90 over Ir 75
GoodPosted for loadAuglaize County, Ohio · Shelby-Auglaize County LN · Structure no. 0601861
- Built
- 1962
- 63 years old, rebuilt 1998
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 230 ft
- 4 main spans
- Daily traffic
- 232
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
Southland RD TR-90 over Ir 75 is a steel continuous stringer/multi-beam or girder carrying Southland RD TR-90 over Ir 75 in Auglaize County, Ohio. It was built in 1962 and reconstructed in 1998, so it is 63 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 232 vehicles a day, projected to reach 322 by 2036. The structure is 230 ft (70.1 m) long and 30 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Southland RD TR-90 over Ir 75 built?
It was built in 1962, making it 63 years old in 2025. It was reconstructed in 1998.
What condition is Southland RD TR-90 over Ir 75 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Southland RD TR-90 over Ir 75 carry?
About 232 vehicles per day (2016 count).
How long is Southland RD TR-90 over Ir 75?
The structure is 230 ft (70.1 m) long with a longest span of 70 ft (21.3 m) and a deck 30 ft wide.
Who owns Southland RD TR-90 over Ir 75?
It is owned by the State Highway Agency.