US Bridges

Plank Pike CR-33A over Usr 33

Good

Auglaize County, Ohio · 3.36 Mi. W. of IR-75 · Structure no. 0600296

Built
1973
52 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
317 ft
4 main spans
Daily traffic
2,335
2015 count
Owner
State
State Highway Agency

About this bridge

Plank Pike CR-33A over Usr 33 is a steel continuous stringer/multi-beam or girder carrying Plank Pike CR-33A over Usr 33 in Auglaize County, Ohio. It was built in 1973, so it is 52 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,335 vehicles a day, roughly 6% of them trucks, projected to reach 3,241 by 2035. The structure is 317 ft (96.6 m) long and 46 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesPlank Pike CR-33A
CrossesUsr 33
Location3.36 Mi. W. of IR-75
RouteCounty Highway C0033
StateOhio
Coordinates40.56434, -84.23172
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating40.3 US tons
Inventory rating31.4 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length317 ft (96.6 m)
Longest span94 ft (28.7 m)
Deck width46 ft (14 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,335 (2015)
Projected traffic3,241 by 2035
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Plank Pike CR-33A over Usr 33 built?

It was built in 1973, making it 52 years old in 2025.

What condition is Plank Pike CR-33A over Usr 33 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Plank Pike CR-33A over Usr 33 carry?

About 2,335 vehicles per day (2015 count), of which roughly 6% are trucks.

How long is Plank Pike CR-33A over Usr 33?

The structure is 317 ft (96.6 m) long with a longest span of 94 ft (28.7 m) and a deck 46 ft wide.

Who owns Plank Pike CR-33A over Usr 33?

It is owned by the State Highway Agency.