US Bridges

Plymouth RD CR-23 over Ir 90

Fair

Ashtabula County, Ohio · 1.61 MI E of SR 11 · Structure no. 0404233

Built
1959
66 years old, rebuilt 2010
Condition
Fair
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
275 ft
4 main spans
Daily traffic
820
2015 count
Owner
State
State Highway Agency

About this bridge

Plymouth RD CR-23 over Ir 90 is a steel continuous stringer/multi-beam or girder carrying Plymouth RD CR-23 over Ir 90 in Ashtabula County, Ohio. It was built in 1959 and reconstructed in 2010, so it is 66 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 820 vehicles a day, roughly 7% of them trucks, projected to reach 1,138 by 2035. The structure is 275 ft (83.7 m) long and 36 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesPlymouth RD CR-23
CrossesIr 90
Location1.61 MI E of SR 11
RouteCounty Highway 23
StateOhio
Coordinates41.83452, -80.73628
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating30.3 US tons
Inventory rating23.3 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 25 or greater
Structure length275 ft (83.7 m)
Longest span85 ft (25.8 m)
Deck width36 ft (11 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic820 (2015)
Projected traffic1,138 by 2035
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Plymouth RD CR-23 over Ir 90 built?

It was built in 1959, making it 66 years old in 2025. It was reconstructed in 2010.

What condition is Plymouth RD CR-23 over Ir 90 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does Plymouth RD CR-23 over Ir 90 carry?

About 820 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is Plymouth RD CR-23 over Ir 90?

The structure is 275 ft (83.7 m) long with a longest span of 85 ft (25.8 m) and a deck 36 ft wide.

Who owns Plymouth RD CR-23 over Ir 90?

It is owned by the State Highway Agency.