US Bridges

SR 95 over Mohican Run

Good

Ashland County, Ohio · .03 Mi.East of SR.179 · Structure no. 0303976

Built
2004
21 years old
Condition
Good
inspected July 2024
Type
Slab
Concrete Continuous
Length
87 ft
3 main spans
Daily traffic
1,344
2015 count
Owner
State
State Highway Agency

About this bridge

SR 95 over Mohican Run is a concrete continuous slab carrying SR 95 over Mohican Run in Ashland County, Ohio. It was built in 2004, so it is 21 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,344 vehicles a day, roughly 13% of them trucks, projected to reach 1,865 by 2035. The structure is 87 ft (26.5 m) long and 38 ft wide. If it were closed, the detour would be 13 mi (21 km).

CarriesSR 95
CrossesMohican Run
Location.03 Mi.East of SR.179
RouteState Highway 95
StateOhio
Coordinates40.72856, -82.18991
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69.7 US tons
Inventory rating53.6 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length87 ft (26.5 m)
Longest span33 ft (10.1 m)
Deck width38 ft (11.6 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,344 (2015)
Projected traffic1,865 by 2035
Trucks13%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed13 mi (21 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 95 over Mohican Run built?

It was built in 2004, making it 21 years old in 2025.

What condition is SR 95 over Mohican Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does SR 95 over Mohican Run carry?

About 1,344 vehicles per day (2015 count), of which roughly 13% are trucks.

How long is SR 95 over Mohican Run?

The structure is 87 ft (26.5 m) long with a longest span of 33 ft (10.1 m) and a deck 38 ft wide.

Who owns SR 95 over Mohican Run?

It is owned by the State Highway Agency.