Lima - High ST over Ottawa River - High ST
GoodAllen County, Ohio · .34 Mi. East of Pine St. · Structure no. 0236640
- Built
- 2001
- 24 years old
- Condition
- Good
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 152 ft
- 3 main spans
- Daily traffic
- 1,866
- 2000 count
- Owner
- County
- County Highway Agency
About this bridge
Lima - High ST over Ottawa River - High ST is a prestressed concrete box beam or girders - multiple carrying Lima - High ST over Ottawa River - High ST in Allen County, Ohio. It was built in 2001, so it is 24 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,866 vehicles a day, roughly 4% of them trucks, projected to reach 2,590 by 2020. The structure is 152 ft (46.2 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lima - High ST over Ottawa River - High ST built?
It was built in 2001, making it 24 years old in 2025.
What condition is Lima - High ST over Ottawa River - High ST in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Lima - High ST over Ottawa River - High ST carry?
About 1,866 vehicles per day (2000 count), of which roughly 4% are trucks.
How long is Lima - High ST over Ottawa River - High ST?
The structure is 152 ft (46.2 m) long with a longest span of 48 ft (14.6 m) and a deck 36 ft wide.
Who owns Lima - High ST over Ottawa River - High ST?
It is owned by the County Highway Agency.