US Bridges

CR 13 Mcclain RD over Ir 75

Good

Allen County, Ohio · 1.16 MI N of Breese RD · Structure no. 0201723

Built
2015
10 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
254 ft
2 main spans
Daily traffic
1,741
2016 count
Owner
State
State Highway Agency

About this bridge

CR 13 Mcclain RD over Ir 75 is a prestressed concrete continuous stringer/multi-beam or girder carrying CR 13 Mcclain RD over Ir 75 in Allen County, Ohio. It was built in 2015, so it is 10 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,741 vehicles a day, roughly 4% of them trucks, projected to reach 2,417 by 2036. The structure is 254 ft (77.3 m) long and 43 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCR 13 Mcclain RD
CrossesIr 75
Location1.16 MI N of Breese RD
RouteCounty Highway 13
StateOhio
Coordinates40.69841, -84.10823
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72.9 US tons
Inventory rating40.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length254 ft (77.3 m)
Longest span125 ft (38.1 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,741 (2016)
Projected traffic2,417 by 2036
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CR 13 Mcclain RD over Ir 75 built?

It was built in 2015, making it 10 years old in 2025.

What condition is CR 13 Mcclain RD over Ir 75 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does CR 13 Mcclain RD over Ir 75 carry?

About 1,741 vehicles per day (2016 count), of which roughly 4% are trucks.

How long is CR 13 Mcclain RD over Ir 75?

The structure is 254 ft (77.3 m) long with a longest span of 125 ft (38.1 m) and a deck 43 ft wide.

Who owns CR 13 Mcclain RD over Ir 75?

It is owned by the State Highway Agency.