Allen County, Ohio · 0.66 Mi. East of Ir 75 · Structure no. 0200638

Built
1970
55 years old, rebuilt 2001
Condition
Good
inspected November 2023
Type
Slab
Concrete Continuous
Length
115 ft
3 main spans
Daily traffic
4,569
2015 count
Owner
State
State Highway Agency

About this bridge

Usr 30 WB over CR222 Napoleon RD is a concrete continuous slab carrying Usr 30 WB over CR222 Napoleon RD in Allen County, Ohio. It was built in 1970 and reconstructed in 2001, so it is 55 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,569 vehicles a day, roughly 43% of them trucks, projected to reach 6,342 by 2035. The structure is 115 ft (35.2 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUsr 30 WB
CrossesCR222 Napoleon RD
Location0.66 Mi. East of Ir 75
RouteU.S. Route 30
StateOhio
Coordinates40.82508, -83.97589
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length115 ft (35.2 m)
Longest span48 ft (14.5 m)
Deck width42 ft (12.8 m)
Roadway width38 ft (11.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,569 (2015)
Projected traffic6,342 by 2035
Trucks43%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Usr 30 WB over CR222 Napoleon RD built?

It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2001.

What condition is Usr 30 WB over CR222 Napoleon RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Usr 30 WB over CR222 Napoleon RD carry?

About 4,569 vehicles per day (2015 count), of which roughly 43% are trucks.

How long is Usr 30 WB over CR222 Napoleon RD?

The structure is 115 ft (35.2 m) long with a longest span of 48 ft (14.5 m) and a deck 42 ft wide.

Who owns Usr 30 WB over CR222 Napoleon RD?

It is owned by the State Highway Agency.