Usr 30 WB over Ottawa River
GoodAllen County, Ohio · 4.83 Mi. East of SR 309 · Structure no. 0200182
- Built
- 1968
- 57 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 220 ft
- 4 main spans
- Daily traffic
- 4,832
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
Usr 30 WB over Ottawa River is a steel continuous stringer/multi-beam or girder carrying Usr 30 WB over Ottawa River in Allen County, Ohio. It was built in 1968, so it is 57 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,832 vehicles a day, roughly 43% of them trucks, projected to reach 6,707 by 2035. The structure is 220 ft (67.2 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Usr 30 WB over Ottawa River built?
It was built in 1968, making it 57 years old in 2025.
What condition is Usr 30 WB over Ottawa River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Usr 30 WB over Ottawa River carry?
About 4,832 vehicles per day (2015 count), of which roughly 43% are trucks.
How long is Usr 30 WB over Ottawa River?
The structure is 220 ft (67.2 m) long with a longest span of 60 ft (18.3 m) and a deck 40 ft wide.
Who owns Usr 30 WB over Ottawa River?
It is owned by the State Highway Agency.