Montrose Station R over Mnrr Hu Line
PoorPosted for loadWestchester County, New York · In Montrose · Structure no. 000000007712680
- Built
- 1937
- 88 years old
- Condition
- Poor
- inspected November 2024
- Type
- Girder and Floorbeam System
- Steel
- Length
- 138 ft
- 2 main spans
- Daily traffic
- 1,750
- 2015 count
- Owner
- Railroad
- Railroad
About this bridge
Montrose Station R over Mnrr Hu Line is a steel girder and floorbeam system carrying Montrose Station R over Mnrr Hu Line in Westchester County, New York. It was built in 1937, so it is 88 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 1,750 vehicles a day, roughly 4% of them trucks, projected to reach 2,125 by 2041. The structure is 138 ft (42.1 m) long and 33 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Montrose Station R over Mnrr Hu Line built?
It was built in 1937, making it 88 years old in 2025.
What condition is Montrose Station R over Mnrr Hu Line in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in November 2024.
How much traffic does Montrose Station R over Mnrr Hu Line carry?
About 1,750 vehicles per day (2015 count), of which roughly 4% are trucks.
How long is Montrose Station R over Mnrr Hu Line?
The structure is 138 ft (42.1 m) long with a longest span of 98 ft (29.8 m) and a deck 33 ft wide.
Who owns Montrose Station R over Mnrr Hu Line?
It is owned by the Railroad and maintained by the Town or Township Highway Agency.