Playland Parkway over 95IX RTE I95
FairWestchester County, New York · .8 MI E JCT I95 & SH 127 · Structure no. 000000005514759
- Built
- 1956
- 69 years old, rebuilt 1997
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 115 ft
- 2 main spans
- Daily traffic
- 2,801
- 2018 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Playland Parkway over 95IX RTE I95 is a steel stringer/multi-beam or girder carrying Playland Parkway over 95IX RTE I95 in Westchester County, New York. It was built in 1956 and reconstructed in 1997, so it is 69 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,801 vehicles a day, roughly 4% of them trucks, projected to reach 4,743 by 2041. The structure is 115 ft (35.1 m) long and 50 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Playland Parkway over 95IX RTE I95 built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1997.
What condition is Playland Parkway over 95IX RTE I95 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Playland Parkway over 95IX RTE I95 carry?
About 2,801 vehicles per day (2018 count), of which roughly 4% are trucks.
How long is Playland Parkway over 95IX RTE I95?
The structure is 115 ft (35.1 m) long with a longest span of 60 ft (18.3 m) and a deck 50 ft wide.
Who owns Playland Parkway over 95IX RTE I95?
It is owned by the State Toll Authority.