RTE I95 over Webster Avenue Metro No
FairWestchester County, New York · New England Viaduct · Structure no. 000000005514539
- Built
- 1954
- 71 years old, rebuilt 1992
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 1,352 ft
- 18 main spans
- Daily traffic
- 107,326
- 2018 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
RTE I95 over Webster Avenue Metro No is a steel stringer/multi-beam or girder carrying RTE I95 over Webster Avenue Metro No in Westchester County, New York. It was built in 1954 and reconstructed in 1992, so it is 71 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 107,326 vehicles a day, roughly 13% of them trucks, projected to reach 181,745 by 2041. The structure is 1,352 ft (412.1 m) long and 96 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I95 over Webster Avenue Metro No built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 1992.
What condition is RTE I95 over Webster Avenue Metro No in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does RTE I95 over Webster Avenue Metro No carry?
About 107,326 vehicles per day (2018 count), of which roughly 13% are trucks.
How long is RTE I95 over Webster Avenue Metro No?
The structure is 1,352 ft (412.1 m) long with a longest span of 133 ft (40.5 m) and a deck 96 ft wide.
Who owns RTE I95 over Webster Avenue Metro No?
It is owned by the State Toll Authority.