Pump House Road over Peekskill Hollow Brook
FairWestchester County, New York · 2.0 MI NE of Peekskill · Structure no. 000000003348430
- Built
- 1930
- 95 years old, rebuilt 1948
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 57 ft
- 1 main span
- Daily traffic
- 1,534
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Pump House Road over Peekskill Hollow Brook is a steel stringer/multi-beam or girder carrying Pump House Road over Peekskill Hollow Brook in Westchester County, New York. It was built in 1930 and reconstructed in 1948, so it is 95 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,534 vehicles a day, roughly 5% of them trucks, projected to reach 2,148 by 2039. The structure is 57 ft (17.4 m) long and 36 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pump House Road over Peekskill Hollow Brook built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 1948.
What condition is Pump House Road over Peekskill Hollow Brook in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Pump House Road over Peekskill Hollow Brook carry?
About 1,534 vehicles per day (2019 count), of which roughly 5% are trucks.
How long is Pump House Road over Peekskill Hollow Brook?
The structure is 57 ft (17.4 m) long with a longest span of 52 ft (15.8 m) and a deck 36 ft wide.
Who owns Pump House Road over Peekskill Hollow Brook?
It is owned by the County Highway Agency.