Croton Dam Road over Croton Reservoir Outlet
GoodPosted for loadWestchester County, New York · 1.5 MI NE Croton on Hud. · Structure no. 000000002265510
- Built
- 1904
- 121 years old, rebuilt 2004
- Condition
- Good
- inspected October 2024
- Type
- Arch - Deck
- Steel
- Length
- 214 ft
- 1 main span
- Daily traffic
- 9
- 2018 count
- Owner
- Local
- Other Local Agency
About this bridge
Croton Dam Road over Croton Reservoir Outlet is a steel arch - deck carrying Croton Dam Road over Croton Reservoir Outlet in Westchester County, New York. It was built in 1904 and reconstructed in 2004, so it is 121 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 9 vehicles a day, projected to reach 13 by 2038. The structure is 214 ft (65.2 m) long and 24 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Croton Dam Road over Croton Reservoir Outlet built?
It was built in 1904, making it 121 years old in 2025. It was reconstructed in 2004.
What condition is Croton Dam Road over Croton Reservoir Outlet in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Croton Dam Road over Croton Reservoir Outlet carry?
About 9 vehicles per day (2018 count).
How long is Croton Dam Road over Croton Reservoir Outlet?
The structure is 214 ft (65.2 m) long with a longest span of 200 ft (61 m) and a deck 24 ft wide.
Who owns Croton Dam Road over Croton Reservoir Outlet?
It is owned by the Other Local Agency.