US Bridges

RTE 987D over Ramp a I287 WB to SH 119

Good

Westchester County, New York · JCT I287 & Sawmill Pkwy · Structure no. 000000001077930

Built
2004
21 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
110 ft
1 main span
Daily traffic
6,674
2020 count
Owner
State
State Highway Agency

About this bridge

RTE 987D over Ramp a I287 WB to SH 119 is a steel stringer/multi-beam or girder carrying RTE 987D over Ramp a I287 WB to SH 119 in Westchester County, New York. It was built in 2004, so it is 21 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,674 vehicles a day, roughly 15% of them trucks, projected to reach 11,301 by 2041. The structure is 110 ft (33.5 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRTE 987D
CrossesRamp a I287 WB to SH 119
LocationJCT I287 & Sawmill Pkwy
RouteInterstate 987D
Coordinates41.05969, -73.82573
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.7 US tons
Inventory rating49.5 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length110 ft (33.5 m)
Longest span105 ft (32 m)
Deck width32 ft (9.9 m)
Roadway width30 ft (9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,674 (2020)
Projected traffic11,301 by 2041
Trucks15%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$3.6 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was RTE 987D over Ramp a I287 WB to SH 119 built?

It was built in 2004, making it 21 years old in 2025.

What condition is RTE 987D over Ramp a I287 WB to SH 119 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does RTE 987D over Ramp a I287 WB to SH 119 carry?

About 6,674 vehicles per day (2020 count), of which roughly 15% are trucks.

How long is RTE 987D over Ramp a I287 WB to SH 119?

The structure is 110 ft (33.5 m) long with a longest span of 105 ft (32 m) and a deck 32 ft wide.

Who owns RTE 987D over Ramp a I287 WB to SH 119?

It is owned by the State Highway Agency.