US Bridges

Ramp I-287 EB to B over Westchester Ave Westche

Good

Westchester County, New York · Bloomington RD Ex of Cwe · Structure no. 000000001044720

Built
2009
16 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
156 ft
2 main spans
Daily traffic
8,065
2020 count
Owner
State
State Highway Agency

About this bridge

Ramp I-287 EB to B over Westchester Ave Westche is a steel continuous stringer/multi-beam or girder carrying Ramp I-287 EB to B over Westchester Ave Westche in Westchester County, New York. It was built in 2009, so it is 16 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,065 vehicles a day, roughly 4% of them trucks, projected to reach 13,657 by 2041. The structure is 156 ft (47.5 m) long and 37 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRamp I-287 EB to B
CrossesWestchester Ave Westche
LocationBloomington RD Ex of Cwe
RouteInterstate 0
Coordinates41.03278, -73.75495
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating81 US tons
Inventory rating53 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 25 or greater
Structure length156 ft (47.5 m)
Longest span75 ft (22.9 m)
Deck width37 ft (11.4 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,065 (2020)
Projected traffic13,657 by 2041
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$5.7 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp I-287 EB to B over Westchester Ave Westche built?

It was built in 2009, making it 16 years old in 2025.

What condition is Ramp I-287 EB to B over Westchester Ave Westche in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Ramp I-287 EB to B over Westchester Ave Westche carry?

About 8,065 vehicles per day (2020 count), of which roughly 4% are trucks.

How long is Ramp I-287 EB to B over Westchester Ave Westche?

The structure is 156 ft (47.5 m) long with a longest span of 75 ft (22.9 m) and a deck 37 ft wide.

Who owns Ramp I-287 EB to B over Westchester Ave Westche?

It is owned by the State Highway Agency.